We are happy to introduce to you some small imrpovements that we make
Worklog card resizing on the Calendar
Adjusting the height of the worklog card
You can now adjust the height of a card by dragging the top of the card and set the start time of the worklog by resizing it.
Adjusting the worklog card to adjacent cards
By double-clicking on the top or bottom of the worklog cards, they will be adjusted to the next/previous worklog, or to the configured start/end of working hours.
Time tracking data on worklog card details
By clicking on the calendar cards, the time tracking data is now also visible.
Quick info about the Issue
On every interface where our Issue picker is visible, by hovering the mouse above a selected Issue, the most important Issue information will appear: summary, assignee, status, time tracking data.
Other changes
We’ve improved our Duration parser to accept even more formats while respecting Jira settings.
We’ve aligned the content to the top on each row (instead of vertically aligned) in the Details report to be more readable.