Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Note
titlePrerequisites

For all of the following procedures:

  • You must be a member of the configured group for Permission to use the Plugin.You must be a member of the configured group for Permission to use Reporting.
  • Timetracker version 4.5.0 or higher must be installed to have access to this feature



Panel

On this page:

Page Tree
rootA következő másolása: Cost Rates

Cost rate types

There is two cost rate type that Wage Managers can configure for users:

  • Default cost rate: The default cost rate will be used with users who do not have an hourly rate defined in the user cost rates table.
  • User cost rate: Define the hourly cost rates for each Jira user. Hourly cost rates will be used in reporting to calculate the costs of work logged by the users.
    • Users in default rate: A subpage where you can filter and view users who have default hourly cost rates. This will help wage managers identify time periods when users do not have a specified cost rate and in which the reports calculate cost values with the default value.



Image Removed

Worklog Attributes

Add pre-defined attributes to your worklogs. Differentiate logged works with labels like "overtime", "not billable", etc.

Image Added

Report by Worklog Attributes

Separate issues and create reports about them based on these attributes


Admin Settings

  • The admin can define worklog attributes here. Users can only use attributes that are defined here!
  • Make Worklog Attributes mandatory so it always has to be filled with at least one pre-defined attribute

Image Added